When the numbers in your app stop adding up
Most solar problems show up as a number: production that is lower than the same month last year, a zero on a sunny afternoon, or a fault light on the inverter. We start with your monitoring history and the inverter’s fault log, so the visit is spent fixing rather than looking.
Re-roofing is the other big reason people call. A solar array has to come off before new shingles go on, and then go back on with new flashing. We remove, store and reinstall the system, coordinate with your roofer, and re-commission it so FortisBC’s records stay correct.
Call 250-250-2525 with your inverter’s fault code or a screenshot of your monitoring app.
SPEC SHEET
Solar Repair, Maintenance & Re-Installation at a glance
- Diagnostic visit
- 1–3 hours, with a written report
- Common fixes
- Inverter faults, failed connectors, breaker trips, damaged wiring, critter damage
- Remove & reinstall
- 1–3 days, coordinated with your roofer
- Cleaning
- Low-pressure, soft-brush, deionised water; usually after smoke season
- Critter guards
- Mesh guards to keep birds and squirrels out from under the array
- Any installer
- We work on systems installed by others
INCLUDED
Repair and maintenance services
- 01
Fault diagnosis
Inverter codes, string tests and thermal checks to find the problem.
- 02
Repairs
Connectors, wiring, breakers, optimizers and inverters replaced where needed.
- 03
Remove and reinstall
Panels off for a re-roof, stored safely, back on with new flashing.
- 04
Cleaning
After a heavy smoke or dust season, when it actually pays.
- 05
Critter guards
Mesh around the array edge to stop nesting.
- 06
Annual check
Output review, fastener torque, wiring condition and a short report.
PRICE
Repair and re-install pricing
| Job | Typical price | Notes |
|---|---|---|
| Diagnostic visit | $250 – $400 | Credited toward the repair if you go ahead |
| Remove & reinstall for re-roof | $150 – $250 per panel | 8 kW system: about $3,000 – $5,000 |
| Cleaning | $8 – $15 per panel | Minimum charge applies |
| Critter guards | $900 – $1,800 | Depends on array perimeter |
Typical ranges, not quotes. Inverter replacement depends on the model; many are still under manufacturer warranty, which we check first.
FAULT FINDER
Common problems and fixes
| What you see | Likely cause | Usual fix |
|---|---|---|
| Zero output on a sunny day | Inverter fault or tripped breaker | Read fault code, reset or replace |
| Output down 20–40% vs last year | Failed string connector, shading, soiling | String test, connector replacement, clean |
| One panel reads low | Optimizer or module fault, hot spot | Thermal check, swap the part |
| Scratching under the array | Birds or squirrels nesting | Clean out and fit mesh guards |
| New roof needed | Roof at end of life | Remove, store, reinstall with new flashing |
We work on systems from any installer. Many inverter faults are still covered by the manufacturer warranty, which we check first.
RE-ROOFING
Remove and reinstall, done in order
- We disconnect, label and remove the modules, rails and mounts.
- Panels are stored safely on site or in our yard.
- Your roofer replaces the roof.
- New flashing and mounts go in with the new shingles.
- We reinstall, re-commission and update the documents.
- 1Solar modulesAll-black 400–450 W panels, sized and laid out to your use.
- 2Rails & clampsAluminium rails that hold the modules a few centimetres off the roof.
- 3Mounts & flashingLag-bolted into rafters with flashing under the shingle or a tile hook.
- 4Roof deckChecked before anything goes on it. Old shingles get replaced first.
- 5Conduit runWiring from the array to the inverter, strapped and sealed.
- 6InverterTurns the panels’ DC into AC your home uses.
- 7DisconnectA lockable switch so crews can isolate the system.
- 8Panel boxThe solar breaker lands here. Older 100 A panels may need an upgrade.
- 9Bidirectional meterSet by FortisBC to count power both ways for net metering.
- 10GridFortisBC’s lines, which bank your surplus as kWh credit.
TIMELINE
From first visit to switch-on
The usual sequence for a Kelowna installation. Your written plan carries real dates.
Timeline as a table
| Step | Who | Weeks | What happens |
|---|---|---|---|
| Assessment | You + us | 0–1 | Bills, roof, panel box, shade. Usually one visit or a video call. |
| Design & written quote | Us | 1–2 | Panel layout, single-line drawing, price, timeline and payback in writing. |
| FortisBC application | FortisBC | 2–5 | Net-metering application; FortisBC reviews it and approves construction. |
| Permits | Us | 3–5 | Technical Safety BC electrical permit; a City of Kelowna building permit if structural work is involved. |
| Install days | Crew | 5–6 | Usually 1–3 days on site for a home: mounts, rails, modules, inverter, wiring. |
| Inspection | Inspector | 6–7 | Electrical inspection of the finished work under the permit. |
| Interconnection & switch-on | FortisBC + you | 7–9 | Interconnection Agreement signed, meter set for net metering, system commissioned. |
QUESTIONS
Questions about repair & re-install
Q01What maintenance do solar panels need?
Very little. Kelowna’s rain and snow clean the panels most of the year; a gentle clean after a heavy smoke or dust season can help. Check your monitoring app monthly and have the system looked at if output drops compared with the same month last year.
Q02Should I replace my roof before installing solar?
If your roof has less than about ten years left, usually yes. A system lasts 25 years or more, and taking it off and putting it back for a re-roof later costs roughly $3,000 to $5,000 on a typical home. We check roof age on the first visit and can coordinate with your roofer.
AREAS
Where we install
Solar Repair, Maintenance & Re-Installation across Kelowna, including:
OTHER SERVICES
Also installed
-
01
Residential Solar InstallationPanels on your house, sized to a year of bills and connected to FortisBC.
Size5–12 kWOn site1–3 daysUtility stepFortisBC net metering
-
02
Business & Farm Solar InstallationRoof or ground arrays for shops, offices, wineries, orchards and strata.
Size15–50 kWOn site3–10 daysUtility stepFortisBC, 50 kW cap
-
03
Off-Grid Solar InstallationStand-alone solar, batteries and backup generation for places without a line.
Size2–15 kWOn site2–5 daysUtility stepNone
-
04
Battery Backup InstallationBatteries and backup panels that keep chosen circuits on in an outage.
Size10–30 kWhOn site1–2 daysUtility stepFortisBC review if paired with solar
WORK ORDER № SIK-015
Start with a free assessment
Tell us where the property is and what you’re after. We reply within one business day with next steps, or a straight answer if solar doesn’t suit it.
OR CALL250-250-2525
- A year of FortisBC bills helps most
- A photo of your electrical panel, door open
- Plans for an EV, heat pump or pool