Installing solar in Tower Ranch
Tower Ranch spreads up the hillside north-east of Rutland around its golf course, with views across the valley to the lake. Homes are mostly newer, larger and built to design guidelines, many with concrete tile roofs. Tile changes the installation more than anything else here: panels go on tile hooks or flashed replacement tiles, not the standard shingle mounts.
Big homes on the hill often have big loads too: air conditioning all summer, a pool or hot tub, and more and more often an EV in the garage. We start from a full year of FortisBC bills, because the summer cooling load lines up neatly with peak solar output. Steep driveways also shape the install day, so access is planned on the first visit.
Call 250-250-2525 with a rough idea of your monthly bill. For most Tower Ranch homes that is enough to tell whether a visit is worth your time.
UTILITY
Your utility in Tower Ranch: FortisBC
Tower Ranch is in FortisBC’s service area, like the rest of the City of Kelowna. That means no BC Hydro rebate, but you keep FortisBC net metering: surplus is banked as kWh and used later in the year, with any leftover settled once a year. Check the name at the top of your bill to be sure.
- Utility
- FortisBC
- Rebate
- None on FortisBC
- Exports
- kWh bank, yearly settlement
- Size cap
- 50 kW per account
- 8 kW payback
- about year 14
INSTALL NOTES
Tower Ranch: what shapes the job
Homes in Tower Ranch tend to be larger, newer and on sloping lots. Tile roofs, design committees, steep driveways and trees are the four things that shape a hillside installation, and we deal with all four before quoting a firm price.
- N1
Concrete tile: proper tile hooks or flashed replacement tiles, and we carry spares, because a few always crack.
- N2
Design guidelines usually ask for flush, all-black arrays; we submit the drawing for approval first.
- N3
Steep lots: material is staged at the street and lifted, never dragged across landscaping.
WHAT WE INSTALL HERE
Services in Tower Ranch
-
01
Residential Solar InstallationPanels on your house, sized to a year of bills and connected to FortisBC.
Size5–12 kWOn site1–3 daysUtility stepFortisBC net metering
-
02
Business & Farm Solar InstallationRoof or ground arrays for shops, offices, wineries, orchards and strata.
Size15–50 kWOn site3–10 daysUtility stepFortisBC, 50 kW cap
-
03
Off-Grid Solar InstallationStand-alone solar, batteries and backup generation for places without a line.
Size2–15 kWOn site2–5 daysUtility stepNone
-
04
Battery Backup InstallationBatteries and backup panels that keep chosen circuits on in an outage.
Size10–30 kWhOn site1–2 daysUtility stepFortisBC review if paired with solar
-
05
Solar Repair, Maintenance & Re-InstallationDiagnostics, repairs, cleaning and remove-and-reinstall for re-roofing.
Visit1–3 hoursRe-install1–3 daysUtility stepUsually none
PRICE
Installation prices for Tower Ranch homes
Tile roofs and steep access sit at the upper end of the price range. Larger homes also spread the fixed costs over more panels, which brings the price per watt down.
| System | Installed price | FortisBC: year-one value · payback | BC Hydro: net of rebate · payback |
|---|---|---|---|
| 5 kW 12 panels · ~6,000 kWh/yr home | $14,000 – $17,500 | $930 · year 15 | $10,600 after $5,000 · year 13 |
| 8 kW 19 panels · ~9,600 kWh/yr home | $20,900 – $26,000 | $1,488 · year 14 | $18,200 after $5,000 · year 14 |
| 10 kW 23 panels · ~12,000 kWh/yr home | $25,500 – $31,700 | $1,860 · year 14 | $23,300 after $5,000 · year 14 |
| 12 kW 28 panels · ~14,400 kWh/yr home | $30,100 – $37,400 | $2,232 · year 13 | $28,400 after $5,000 · year 15 |
Installed price ranges, not quotes, as of October 2026. Each size assumes a home using about as much as the system makes (1,200 kWh per kW a year). FortisBC value at about 15.5¢/kWh; BC Hydro shown for comparison (rebate, 40% self-use, 10¢ exports). Paybacks use the mid price and a 3% yearly rate rise.
TIMELINE
How long an install in Tower Ranch takes
Design-committee approval and tile-roof logistics add a week or two. Install days on a slope run longer than on flat ground, usually two to three days for a large home.
Timeline as a table
| Step | Who | Weeks | What happens |
|---|---|---|---|
| Assessment | You + us | 0–1 | Bills, roof, panel box, shade. Usually one visit or a video call. |
| Design & written quote | Us | 1–2 | Panel layout, single-line drawing, price, timeline and payback in writing. |
| FortisBC application | FortisBC | 2–5 | Net-metering application; FortisBC reviews it and approves construction. |
| Permits | Us | 3–5 | Technical Safety BC electrical permit; a City of Kelowna building permit if structural work is involved. |
| Install days | Crew | 5–6 | Usually 1–3 days on site for a home: mounts, rails, modules, inverter, wiring. |
| Inspection | Inspector | 6–7 | Electrical inspection of the finished work under the permit. |
| Interconnection & switch-on | FortisBC + you | 7–9 | Interconnection Agreement signed, meter set for net metering, system commissioned. |
WORK ORDER № SIK-024
Book an assessment in Tower Ranch
Tell us where the property is and what you’re after. We reply within one business day with next steps, or a straight answer if solar doesn’t suit it.
OR CALL250-250-2525
- A year of FortisBC bills helps most
- A photo of your electrical panel, door open
- Plans for an EV, heat pump or pool