HILLSIDE & GOLF COMMUNITIES
Solar Installation in Clifton, Kelowna
View homes, tile roofs and design guidelines in Clifton: installed flush, all-black and approved before we order a single panel.

LOCAL NOTES
Installing solar in Clifton
Clifton follows Clifton Road up the hillside north of downtown, between Knox Mountain and the Glenmore valley. It mixes 1990s and 2000s homes with newer builds on sloping lots, many with trees in the yard. The age range means we see everything from a fresh roof to one near the end of its life.
Roof age is the first thing we check on a Clifton home. An array lasts 25 years or more, so mounting it on shingles with five years left means paying to take it off and put it back later. If your roof is close, we price the solar together with the re-roof, or wait until the roof is done.
Call 250-250-2525 with a rough idea of your monthly bill. For most Clifton homes that is enough to tell whether a visit is worth your time.
UTILITY
Your utility in Clifton: FortisBC
Clifton is in FortisBC’s service area, like the rest of the City of Kelowna. That means no BC Hydro rebate, but you keep FortisBC net metering: surplus is banked as kWh and used later in the year, with any leftover settled once a year. Check the name at the top of your bill to be sure.
- Utility
- FortisBC
- Rebate
- None on FortisBC
- Exports
- kWh bank, yearly settlement
- Size cap
- 50 kW per account
- 8 kW payback
- about year 14
INSTALL NOTES
Clifton: what shapes the job
Homes in Clifton tend to be larger, newer and on sloping lots. Tile roofs, design committees, steep driveways and trees are the four things that shape a hillside installation, and we deal with all four before quoting a firm price.
- N1
Re-roof first? We coordinate with your roofer so the mounts go in with the new shingles.
- N2
Sloping lots: scaffolding or a lift on the downhill side, planned on the first visit.
- N3
1990s homes often have 100 to 125 A services; we check the panel has room for a solar breaker.
WHAT WE INSTALL HERE
Services in Clifton
-
01
Residential Solar InstallationPanels on your house, sized to a year of bills and connected to FortisBC.
Size5–12 kWOn site1–3 daysUtility stepFortisBC net metering
-
02
Business & Farm Solar InstallationRoof or ground arrays for shops, offices, wineries, orchards and strata.
Size15–50 kWOn site3–10 daysUtility stepFortisBC, 50 kW cap
-
03
Off-Grid Solar InstallationStand-alone solar, batteries and backup generation for places without a line.
Size2–15 kWOn site2–5 daysUtility stepNone
-
04
Battery Backup InstallationBatteries and backup panels that keep chosen circuits on in an outage.
Size10–30 kWhOn site1–2 daysUtility stepFortisBC review if paired with solar
-
05
Solar Repair, Maintenance & Re-InstallationDiagnostics, repairs, cleaning and remove-and-reinstall for re-roofing.
Visit1–3 hoursRe-install1–3 daysUtility stepUsually none
PRICE
Installation prices for Clifton homes
Tile roofs and steep access sit at the upper end of the price range. Larger homes also spread the fixed costs over more panels, which brings the price per watt down.
| System | Installed price | FortisBC: year-one value · payback | BC Hydro: net of rebate · payback |
|---|---|---|---|
| 5 kW 12 panels · ~6,000 kWh/yr home | $14,000 – $17,500 | $930 · year 15 | $10,600 after $5,000 · year 13 |
| 8 kW 19 panels · ~9,600 kWh/yr home | $20,900 – $26,000 | $1,488 · year 14 | $18,200 after $5,000 · year 14 |
| 10 kW 23 panels · ~12,000 kWh/yr home | $25,500 – $31,700 | $1,860 · year 14 | $23,300 after $5,000 · year 14 |
| 12 kW 28 panels · ~14,400 kWh/yr home | $30,100 – $37,400 | $2,232 · year 13 | $28,400 after $5,000 · year 15 |
Installed price ranges, not quotes, as of October 2026. Each size assumes a home using about as much as the system makes (1,200 kWh per kW a year). FortisBC value at about 15.5¢/kWh; BC Hydro shown for comparison (rebate, 40% self-use, 10¢ exports). Paybacks use the mid price and a 3% yearly rate rise.
TIMELINE
How long an install in Clifton takes
Design-committee approval and tile-roof logistics add a week or two. Install days on a slope run longer than on flat ground, usually two to three days for a large home.
Timeline as a table
| Step | Who | Weeks | What happens |
|---|---|---|---|
| Assessment | You + us | 0–1 | Bills, roof, panel box, shade. Usually one visit or a video call. |
| Design & written quote | Us | 1–2 | Panel layout, single-line drawing, price, timeline and payback in writing. |
| FortisBC application | FortisBC | 2–5 | Net-metering application; FortisBC reviews it and approves construction. |
| Permits | Us | 3–5 | Technical Safety BC electrical permit; a City of Kelowna building permit if structural work is involved. |
| Install days | Crew | 5–6 | Usually 1–3 days on site for a home: mounts, rails, modules, inverter, wiring. |
| Inspection | Inspector | 6–7 | Electrical inspection of the finished work under the permit. |
| Interconnection & switch-on | FortisBC + you | 7–9 | Interconnection Agreement signed, meter set for net metering, system commissioned. |
WORK ORDER № SIK-030
Book an assessment in Clifton
Tell us where the property is and what you’re after. We reply within one business day with next steps, or a straight answer if solar doesn’t suit it.
OR CALL250-250-2525
- A year of FortisBC bills helps most
- A photo of your electrical panel, door open
- Plans for an EV, heat pump or pool